The overall project consisted of major renovations to the library, performance practice areas (band hall, percussion room, choir hall, music practice rooms), main entry and corridors, dining areas, gymnasium, and large group instruction areas. Additional improvements include a replacement CTE wing, 900 seat auditorium and black box, and a new dance studio with support for aerial performers, and general campus-wide acoustics for mechanical rooms.
WJHW provided Acoustics and Noise Control, Production Intercom Systems, Theatre Planning and Consulting Services, Performance Lighting and Controls Systems Design, and Rigging Systems and Stage Equipment Design. The design team also provided design for Sound and Audio-Visual systems throughout the high school.
SCOPE OF DESIGN SERVICES:
– Acoustics & Noise Control
– Audio-Visual Systems
– Sound Systems
– Theatre Consulting
– Lighting Systems
– Rigging Systems
– TV Production Systems
– Vibration Control
KEY PERSONNEL: David Vieira, Paul Copenhaver, Fritz Schwentker, Christopher Ainley, and Joey Hoskison.